December 30, 2009

Arapahoe Basin Announces New Lift for 2010-2011 Season


Arapahoe Basin, CO - Detachable quad chairlift to replace current base area triple chair.

This summer A-Basin Ski Area will begin construction on a new detachable quad chairlift. The new lift will replace the Exhibition fixed grip triple chair located in the base area, which was installed in 1978. The new lift will have a capacity of 2000 people per hour, a length of 2877 feet and have a vertical rise of 719 feet. The ride time will be just under three minutes, half the time of the current lift ride from base area to mid-mountain.

Construction is scheduled for mid-June and will not impact the current season’s closing date (tentatively scheduled for June 6, 2010). The top terminal of the new lift will be slightly realigned uphill and to the west away from Black Mountain Lodge. The lower terminal will remain in the same location.

Arapahoe Basin is taking suggestions for the name of the new lift. A 2010-2011 Arapahoe Basin Season Pass or $300 gift certificate to Arapahoe Sports will be given to the person whose suggestion is selected. If multiple people provide the winning selection, the award will be given to the first suggestion received. Send suggestions to Alan Henceroth, Arapahoe Basin COO and General Manager!
A-Basin Info

No comments:

Post a Comment